I am running customer site deployments in a single Jira project. I have introduced the following hierarchy:
- Epic:
- Site (for example: Factory A in Brazil)
- Task:
- Factory Line X
- Factory Line Y
- Factory Line Z
- Subtask:
- Mechanical Installation (Installation subtask type)
- Network Integration (Network subtask type)
- Model Deployment (Model building subtask type)
I am trying to visualize all substask from the model building subtask type into a single Kanban board. However I keep running in the same problem, where I can never visualize the subtasks without its task parent filter.
For example, a business project board visualizes it like this:
A software project board visualizes it like this, it is a little better:
Ideally, I would like to have the subtasks visualized in the kanban board with both task and epic visualized in the task card.
Are there any other options I can explore?