Ask any modern AI assistant for a diagram — "draw me the checkout flow" — and almost every one answers back in the same language: Mermaid. Not a PNG. Not a proprietary format. Plain text that renders into a diagram.
That's not a coincidence, and it matters for how you document things in Confluence. So this article answers two questions:
- Why has Mermaid become the de facto text-to-diagram standard in the AI era — and why should you care?
- What can Mermaid actually do? — with rendered examples and copy-paste-ready code for the eight diagrams teams use every day, plus three brand-new types from Mermaid 11.16.
I'm Simon from NGPILOT, and I build a Mermaid app for Confluence and Jira — so I'll show the diagrams inside the editor I work on. But every code block below is standard Mermaid syntax that runs anywhere Mermaid 11.16+ does. The goal is for you to walk away knowing why Mermaid is worth adopting, and exactly which diagram to reach for in each situation.
I wrote earlier about why we built yet another Mermaid app for Confluence and Jira; this is the practical follow-up.

Part 1 — Why Mermaid Wins the Text-to-Diagram Standard
There are dozens of diagramming tools. So why did the entire AI ecosystem quietly standardise on Mermaid? Five reasons, and together they explain the "why."
1. It's text — and AI's native output is Markdown
Large language models predict text, and their default output format is Markdown. When you ask an AI "diagram our deploy pipeline," it doesn't return a file — it returns Markdown with a ```mermaid code fence inside it. Mermaid is that fence's content: text that streams token-by-token in real time. It cannot do that with a binary image, an Excalidraw scene file, or a Visio .vsdx.
This is the deepest reason Mermaid won: the format aligns with how AI actually produces output. Mermaid lives inside Markdown, Markdown is what AI emits, and the two compose perfectly. The practical upshot is that you can paste an AI's entire Markdown response — prose, headings, code, and diagrams in ```mermaid fences — into one editor and have it all render. (If that's the workflow you want, we built Enhanced Markdown for Confluence precisely for it — full Mermaid v11 inside Markdown fences, with LaTeX and syntax-highlighted code alongside. I wrote about the Markdown-and-Mermaid workflow in detail in an earlier App Central post, "Enhanced Markdown for Confluence: Mermaid, LaTeX, and Code — All Rendered, All Inside Atlassian.")
2. It's diffable and version-controllable
A diagram stored as an image is a black box. When someone changes one arrow, your git diff shows "binary file changed" — no idea what moved. A Mermaid diagram lives in your page source (or repo) as text, so:
- Every change is a readable diff
- You can review diagram edits in a pull request
- You can resolve merge conflicts on a diagram the same way you do on code
- Blame works — you can see who changed which arrow and when
For teams that treat documentation like code, this alone is decisive.
3. It's declarative — you describe intent, not pixels
With a drag-and-drop tool, you spend your time nudging boxes into alignment. With Mermaid, you describe the structure (A connects to B, B connects to C) and the engine handles layout. This means:
- The same source reflows cleanly when you add a node — no manual repositioning
- You can generate it programmatically (from a database schema, an OpenAPI spec, a folder structure)
- It's accessible — the source is readable by screen readers and search, not trapped in pixels
4. It's portable and ubiquitous
Mermaid renders natively in GitHub, GitLab, Notion, Obsidian, VS Code, Slack, and — with the right app — Confluence and Jira. Write it once and it works everywhere. Your diagramming knowledge is transferable, not locked to one vendor's file format.
5. It keeps growing — and AI keeps up
Mermaid now ships new diagram types every release. Because each new type is just more text syntax, AI models pick them up quickly. That brings us to Part 2.
6. How Mermaid compares to the other text-to-diagram tools
Mermaid isn't the only text-to-diagram format — so why did it become the AI default? Each alternative has real strengths, but each also has a structural reason it didn't win the AI mainstream:
Graphviz (DOT) — the granddaddy of them all, dating to 1991. Excellent at graph layout (automatic node placement for dense networks, dependency graphs, org charts). Its limitation for AI: the DOT syntax is more verbose and less human-memorable than Mermaid, and it's laser-focused on graphs — there's no Gantt, no sequence, no pie. It's the right tool when you have many nodes and need a layout engine to sort them out; for everyday docs it's heavier than most teams want.
D2 — a newer, modern declarative language (from Terrastruct). Arguably the nicest syntax to read and write of the bunch, with great defaults and theming. Its constraint: a smaller ecosystem and a shorter track record, so fewer places render it natively and AI models have less training data on it. Beautiful, but not (yet) ubiquitous.
PlantUML — mature and deep for software-diagram types (sequence, class, component, deployment). Its catch: syntax that leans on pseudo-code (@startuml/@enduml, :, ;) and historically needed Java to render. Powerful for UML-heavy work, less friendly for a quick "draw me a flowchart."
Excalidraw — a different category entirely: hand-drawn, freehand diagrams and whiteboards. It's brilliant for brainstorming, sketches, and that "back of a napkin" look. But it's visual-first, not text-first — the source is a scene graph, not something you'd type or that an AI streams. It complements Mermaid rather than competing with it.
So the landscape is: Graphviz for dense auto-laid-out graphs, D2 for elegant modern syntax, PlantUML for deep UML, Excalidraw for freehand whiteboarding — and Mermaid for the broad, readable, AI-friendly middle that covers most of what teams actually document. That breadth-plus-readability is precisely why models default to it.
The takeaway
It's not that the other formats are worse — they each do something Mermaid can't. It's that Mermaid sits in the sweet spot: readable enough for humans, simple enough for AI, broad enough for 29 diagram types, and rendered in enough places that "diagram as text" just works. The rest of this article shows what that breadth actually looks like.
Part 2 — What Can Mermaid Actually Do?
Mermaid supports 29 diagram types. They split into two groups that are worth knowing about, because it affects how you write them and how stable the syntax is.
18 stable diagrams — syntax is locked, no -beta keyword needed. These are the workhorses; the ones you'll reach for almost every day. We'll go deep on the eight most common below, with a rendered example and copy-paste code for each.
| Type |
One-liner |
|---|
| Flowchart |
Decision flows and branching logic |
| Sequence |
Messages between systems over time |
| State |
Object lifecycles and transitions |
| Class |
Object-oriented structure |
| Entity Relationship |
Data models (tables, keys, relations) |
| User Journey |
A persona's experience across stages |
| Gantt |
Schedules with dependencies |
| Pie Chart |
Proportions of a whole |
| Git Graph |
Branches and merges in a repo |
| Mindmap |
Ideas branching from a centre |
| Timeline |
An ordered chronology of events |
| Quadrant Chart |
A 2×2 priority/scoring matrix |
| Requirement |
System requirements & traceability |
| C4 Diagram |
Software architecture (Context/Container/Component) |
| Kanban |
A board of tickets by column |
| Treemap |
Nested proportional rectangles |
| Ishikawa |
Cause-and-effect (fishbone) |
| ZenUML |
Sequence-style diagrams with declarative syntax |
11 beta diagrams — Mermaid ships them behind a -beta keyword (e.g. swimlane-beta). They render reliably today, but the syntax may be refined in a future minor version, so don't pin automation to every detail. These extend text-to-diagram into newer territory. We'll look at three of the newest in Part 3.
| Type |
Keyword |
One-liner |
|---|
| Swimlane |
swimlane-beta |
Cross-team process with one lane per actor |
| Architecture |
architecture-beta |
System/component architecture |
| Block |
block-beta |
Block-and-arrow structural diagrams |
| Packet |
packet-beta |
Network packet / bit-field layouts |
| Radar |
radar-beta |
Multi-axis comparison radar |
| Railroad |
railroad-ebnf-beta |
Grammar / syntax diagrams |
| Cynefin |
cynefin-beta |
Problem-domain sense-making framework |
| Sankey |
sankey-beta |
Flow quantities through a system |
| Treeview |
treeView-beta |
Hierarchical tree |
| Venn |
venn-beta |
Set overlaps |
| XY Chart |
xychart-beta |
Bar and line charts |
Now, let's go deep on the eight stable diagrams teams use most.
1. Flowchart — the decision diagram
The scenario: You're documenting a bug triage process so every new engineer follows the same path. An issue comes in → is it reproducible? → what severity? → where does it go? Branching logic is exactly what a flowchart is built for, and it's the diagram AI generates most reliably.
The code:
flowchart TD
A[New issue reported] --> B{Reproducible?}
B -->|No| C[Request more info]
C --> A
B -->|Yes| D{Severity?}
D -->|Critical| E[Hotfix branch]
D -->|Major| F[Next sprint]
D -->|Minor| G[Backlog]
E --> H[Deploy & verify]
H --> I[Close issue]
F --> I
G --> J[Triage review]
J --> I
What it renders to:

Syntax notes:
flowchart TD — TD = top-down (also LR, BT, RL).
id[Label] = rectangle; id{Label} = decision diamond; id(Label) = rounded/stadium; id((Label)) = circle.
A -->|Yes| B labels the arrow. Use --- for a plain line, ==> for a thick arrow.
Other scenarios: onboarding steps, "what happens when a customer cancels," CI/CD pipeline gates, escalation paths.
2. Sequence Diagram — who-talks-to-whom, in order
The scenario: You're onboarding engineers to how SSO login actually works — the back-and-forth between the user's browser, Confluence, and the identity provider. This is a temporal conversation: the order of messages is the whole point, and a flowchart can't capture it.
The code:
sequenceDiagram
actor User
participant Browser
participant Confluence
participant IdP as SSO Provider
User->>Browser: Click "Sign in"
Browser->>Confluence: GET /login
Confluence-->>Browser: Redirect to IdP (SAML)
Browser->>IdP: Auth request
User->>IdP: Enter credentials
IdP-->>Browser: SAML assertion
Browser->>Confluence: POST assertion
Confluence-->>Browser: Session cookie + dashboard
What it renders to:

Syntax notes:
participant X declares a column; participant X as Display Name renames it.
->> = solid arrow (request); -->> = dashed arrow (response/return).
actor User renders as a stick figure. Wrap blocks in loop ... end, alt ... else ... end, or opt ... end for loops and conditionals.
Other scenarios: OAuth flows, payment processing, API request/response contracts, microservice choreography, support ticket lifecycle.
3. Gantt — schedules and dependencies
The scenario: It's planning day and you need a Q3 roadmap that shows which tasks depend on which, and when they land. A table of dates doesn't communicate overlap or critical path — a Gantt does, instantly.
The code:
gantt
title Q3 2026 Platform Roadmap
dateFormat YYYY-MM-DD
axisFormat %b %d
section Foundation
Auth refactor :a1, 2026-07-01, 21d
Database migration :a2, after a1, 14d
section Features
New editor :b1, 2026-07-15, 28d
Dark mode :b2, after a1, 14d
section Launch
Beta testing :c1, after b1, 14d
GA release :milestone, c2, after c1, 0d
What it renders to:

Syntax notes:
dateFormat defines how you write dates; axisFormat how the axis shows them.
task name :id, start, duration — or :id, after otherId, duration to chain dependencies.
section Group visually clusters tasks. :milestone, id, date, 0d renders a diamond milestone.
Other scenarios: release plans, migration timelines, marketing campaigns, hiring plans.
4. Entity Relationship (ER) — data models
The scenario: You're writing the data model doc for a Confluence-like knowledge base — Spaces contain Pages, Pages have Comments and Attachments, Users author everything. New engineers need to see the shape of the data before they touch the schema.
The code:
erDiagram
SPACE ||--o{ PAGE : contains
PAGE ||--o{ COMMENT : has
PAGE ||--o{ ATTACHMENT : includes
PAGE }o--|| USER : authored_by
USER ||--o{ COMMENT : writes
PAGE {
string id
string title
string body
}
USER {
string id
string name
string email
}
COMMENT {
string id
string body
date created
}
What it renders to:

Syntax notes:
- The relationship notation is the key:
||--o{. The left part (||, o|, }o) is one side's cardinality; -- is the link; the right part (o{, ||, }o) is the other side's.
|| = exactly one; o| = zero or one; }o = zero or many; }| = one or many.
- So
PAGE ||--o{ COMMENT : has reads: "one PAGE has zero-or-many COMMENTs."
- The
{ ... } blocks document each entity's columns — type then name, one per line.
Other scenarios: database schemas, API resource models, domain-driven design aggregates.
5. Mindmap — branching ideas
The scenario: You're kicking off a product launch and want a single page that shows every workstream at a glance — Engineering, Marketing, Sales, Support — each with their sub-tasks. A mindmap radiates from one centre, which mirrors how planning actually feels.
The code:
mindmap
root((Product Launch))
Engineering
Feature freeze
Bug bash
Perf testing
Marketing
Landing page
Email campaign
Press kit
Sales
Demo prep
Pricing tiers
Enablement deck
Support
Runbooks
On-call rota
What it renders to:

Syntax notes:
- Indentation is the structure — each level of indent is a child node. No arrows.
root((Label)) = the central node (double parens = circle). Plain Label = a box.
- Keep it 2–3 levels deep; beyond that it becomes unreadable and you want a tree diagram instead.
Other scenarios: meeting agendas, OKR breakdowns, feature scope brainstorming, onboarding topic maps.
6. Pie Chart — proportions
The scenario: Sprint review time. You want to show how this sprint's capacity was spent — 45% features, 30% bugs, 15% tech debt, 10% docs. Simple proportions, nothing more.
The code:
pie title Sprint Issue Distribution
"Features" : 45
"Bugs" : 30
"Tech debt" : 15
"Documentation" : 10
What it renders to:

Syntax notes:
"Label" : value — values are relative weights, not percentages. Mermaid computes the slices.
- Add a title with
pie title ... on the first line.
Other scenarios: budget allocation, support ticket categories, time-tracking breakdowns, survey results.
7. Timeline — chronology of milestones
The scenario: A launch roadmap that's less granular than a Gantt — just the major beats across quarters: beta, public beta, GA, iterate. Timeline is the right tool when you care about sequence and milestones, not task durations and dependencies.
The code:
timeline
title Product Launch Roadmap
section Q3 2026
Beta release : Internal testing only
Public beta : Open sign-ups
section Q4 2026
GA launch : Full release
Post-launch : Iterate on feedback
What it renders to:

Syntax notes:
section Period groups events; each Event : detail line sits under it.
- Unlike Gantt, there are no dates or durations — just ordered events. That's the feature, not a limitation: it reads as a story.
Other scenarios: company history, incident postmortem chronologies, project retrospectives, changelog highlights.
8. Git Graph — branches and merges
The scenario: You're documenting your team's GitFlow branching strategy so new hires stop committing straight to main. The whole value is visualising where branches fork and merge.
The code:
gitGraph
commit
branch develop
checkout develop
commit
branch feature/auth
checkout feature/auth
commit
commit
checkout develop
merge feature/auth
checkout main
merge develop
commit type: HIGHLIGHT tag: "v1.0"
What it renders to:

Syntax notes:
commit adds a commit on the current branch; branch name forks; checkout name switches; merge name brings a branch back in.
commit type: HIGHLIGHT tag: "v1.0" marks a release commit with a tag.
Other scenarios: release management docs, explaining trunk-based vs GitFlow, onboarding to a repo's conventions.
Part 3 — The Beta Group: Where Mermaid Is Headed Next
The 18 stable diagrams above cover most day-to-day needs. Mermaid's 11 beta diagrams are where the project is actively growing — they extend text-to-diagram into territory the workhorses can't reach. All 11 render reliably today; the -beta keyword just signals that syntax may still be refined in a future minor version.
Here's the full beta group, then a closer look at the three newest (added in Mermaid 11.16).
| Type |
Keyword |
What it's for |
|---|
| Swimlane |
swimlane-beta |
Cross-team process with one lane per actor |
| Cynefin |
cynefin-beta |
Problem-domain sense-making (Clear/Complicated/Complex/Chaotic/Confusion) |
| Railroad |
railroad-ebnf-beta |
Grammar / syntax diagrams for languages & formats |
| Architecture |
architecture-beta |
System and component architecture |
| Block |
block-beta |
Block-and-arrow structural diagrams |
| Packet |
packet-beta |
Network packet / bit-field layouts |
| Radar |
radar-beta |
Multi-axis comparison (e.g. skill assessments) |
| Sankey |
sankey-beta |
Flow quantities through a system (budget, traffic) |
| Treemap |
treemap |
Nested proportional rectangles (org/asset breakdowns) |
| Treeview |
treeView-beta |
Hierarchical tree (file structures, org charts) |
| Venn |
venn-beta |
Set overlaps |
| XY Chart |
xychart-beta |
Bar and line charts |
The three newest (Mermaid 11.16)
Swimlane — who does what in a cross-team process. A flowchart shows what happens; a swimlane shows who does it. Each subgraph becomes a lane; write all edges after all lanes so hand-offs render cleanly.
swimlane-beta LR
subgraph Customer
order[Place order]
receive[Receive delivery]
end
subgraph Sales
review[Review order]
confirm[Confirm and invoice]
end
subgraph Warehouse
pick[Pick items]
pack[Pack shipment]
end
subgraph Shipping
dispatch[Dispatch]
end
order --> review
review --> pick
pick --> pack
pack --> dispatch
dispatch --> confirm
confirm --> receive

Cynefin — what kind of problem is this? Dave Snowden's framework helps a team ask "what kind of situation are we in?" before acting. Two people arguing about a solution are often actually disagreeing about which of the five domains the problem sits in — this diagram makes that visible. The five domain names are fixed keywords; the --> transitions show how situations drift between domains.
cynefin-beta
complex
"Probe - run safe-to-fail experiments"
"Sense emerging patterns"
complicated
"Sense - gather data"
"Analyze - apply expert knowledge"
clear
"Sense - categorize"
"Respond - apply best practice"
chaotic
"Act - stabilize first"
"Sense - what is happening"
confusion
"Break the problem down"
clear --> chaotic : "Complacency"
chaotic --> complex : "Stabilized"
complex --> complicated : "Pattern identified"
complicated --> clear : "Best practice codified"

Railroad — documenting grammars and file formats. Syntax diagrams visualise the valid structure of a language, config schema, or DSL — scannable in a way raw EBNF text never is. Each line is one rule (name = definition ;); "text" = literal terminal, | = choice, * = repeat, + = one-or-more. Use it for documenting query languages, upload-file formats, or any DSL your product defines.
railroad-ebnf-beta
title "Arithmetic Expression Grammar"
expression = term ( ( "+" | "-" ) term )* ;
term = factor ( ( "*" | "/" ) factor )* ;
factor = number | "(" expression ")" ;
number = digit+ ;
digit = "0" | "1" | "2" | "3" | "4" | "5" | "6" | "7" | "8" | "9" ;

The other eight betas round out specialised cases: Sankey for budget/traffic flows, Radar for multi-axis scoring, Packet for network bit-fields, Architecture and Block for structural views, Treeview for hierarchies, Venn for set overlap, and XY Chart when you need an actual bar or line chart rather than a relational diagram.
Putting AI + Mermaid into a Confluence page
Here's the workflow the "AI era" actually enables, end to end:
- Describe your diagram to an AI assistant in plain language ("draw a sequence diagram for our SSO login").
- Paste the Mermaid it returns into a Mermaid editor.
- Preview live, tweak the text, save.
No image editing, no re-drawing when a box changes. The diagram is text from start to finish — which is exactly why it composes so well with AI.
The Mermaid+ editor has all 29 types as one-click Quick Templates in the middle column, with a live preview on the left and a code editor on the right. There's also a built-in syntax guide (the ? button) listing every type with hover-to-insert examples — because, honestly, I keep forgetting the syntax too.

The diagrams above were rendered with Mermaid 11.16, the same version the app runs. A pre-rendered SVG is cached when you save, so readers never wait on a diagram engine on page load, and colours adapt to dark mode without re-rendering. (I covered why that caching matters in the previous article.)
Quick reference — which diagram for which job?
Stable (syntax locked, your daily drivers):
| You want to show… |
Use |
|---|
| Branching decision logic |
Flowchart |
| Messages between systems over time |
Sequence |
| A project schedule with dependencies |
Gantt |
| A data model (tables & relationships) |
ER |
| Ideas branching from one concept |
Mindmap |
| Proportions of a whole |
Pie |
| An ordered chronology of milestones |
Timeline |
| Branches and merges in a repo |
Git Graph |
| A 2×2 priority/scoring matrix |
Quadrant Chart |
| Object lifecycles and transitions |
State |
| Software architecture (C4) |
C4 Diagram |
| Cause-and-effect (fishbone) |
Ishikawa |
Beta (-beta keyword, syntax may refine):
| You want to show… |
Use |
|---|
| A process and who owns each step |
Swimlane |
| What kind of problem a team faces |
Cynefin |
| The valid structure of a language/format |
Railroad |
| Flow quantities through a system |
Sankey |
| Nested proportional breakdowns |
Treemap |
| Multi-axis comparison / scoring |
Radar |
| Hierarchical tree (file structures, orgs) |
Treeview |
| Set overlaps |
Venn |
Over to you
The throughline is simple: Mermaid won the text-to-diagram standard because it's text, and text is what AI, version control, and search all understand natively. The 18 stable diagrams cover the vast majority of what teams document day to day — and the 11 beta diagrams show that "text-to-diagram" now reaches into strategy, cross-team processes, language specs, and quantitative charts.
Picking the right tool for the job
At NGPILOT we build for the whole text-to-diagram spectrum, because — as the comparison above showed — no single format is best for everything. A quick guide:
- The AI-to-page workflow → paste an AI's full Markdown response (prose +
```mermaid fences + code) into one editor that renders all of it. That's the native shape of how AI outputs diagrams.
- Most docs, most of the time → Mermaid as a standalone diagram. Start here.
- Dense graphs / auto-layout (dependency graphs, large networks) → Graphviz, where the DOT engine shines.
- Freehand sketches, whiteboards, brainstorming → Excalidraw, when you want the "back of a napkin" look rather than a structured diagram.
All of them run on Atlassian Forge — nothing leaves your site — and each has a live-preview editor so you see the diagram as you write the source.
But the question I'd really love to hear answered: what's the diagram you currently struggle to make — and have you tried just asking an AI for it in Mermaid? Drop it in the comments; I read every one, and a few diagram types in the app today exist because someone described a problem in a thread exactly like this.
— Simon from NGPILOT