I have an Automation which creates two Stories with a lot of Subtasks.
They were running at the same time before (Branch at the same time).
Now I have to let them run one after another, as I need to link some of the Tickets from Story 1 to Some of the Story 2 Tickets (which I cant with the at the same time setup).
Now I have the Problem that I can't end one Group and start another - but this feature is so nice to visually tell where which Story starts and ends.
Is there a way to add end Group and start new one as a new step?
Or do I do this in a different way? Can somebody help me?
