Hello, I need to record in a field (to later perform calculations) the time logged on the subtasks associated with an epic when the epic is closed.
For example:
subtask1 = 1h,
subtask2 = 1h,
Then in the epic ticket, have a field showing 2h.
Would it be possible to do this with an automation? How would it be done?
Any help on this matter would be greatly appreciated.
Thank you very much.