Since lists have merged with all work items, it is no longer easily possible to prioritise Epics. The only way i can see to do this now is to use the epic panel in the backlog view.
For now, I have prefixed the epics with 0_ 1_ etc!
What happened here, massive oversight in the merge of those two screens! Am i missing something?