This might be a tough question to write out...
So we have a status called Prioritization. Every work item in this status has a priority number field listed. For this example, lets just say we have 3 work items:
- Work item 1: Priority = 1
- Work item 2: Priority = 2
- Work item 3: Priority = 3
What we would like to happen is when one of these work items is transitioned to the next status (lets say the next status is In Progress), it changes the priority like so:
- Work item 1: transitioned to In Progress
- Work item 2: Priority = 1
- Work item 3: Priority = 2
Is this possible through automation and if so what would that look like?