Hi everyone,
I’m running into something odd. The Priority field in my project is showing up, but it looks like it’s frozen. It is stuck on “Medium,” and I can’t click the dropdown or make any changes.
I’m not sure if this is something I’m doing wrong, if it’s a permissions issue, or if Priority is just not meant to be editable in certain setups. Has anyone else run into this? Is there a setting or configuration I should check, or is this something only admins can change?
Thanks in advance for any guidance!