By default, the Epic work type is linked to the Epic hierarchy level (level 1). However, we now also have Feature at this level 1 and want to place Epic above Feature. Is this possible?
So:
2 Epic
1 Feature
0 Story
-1 subtask
What alternatives are there to create this situation? We have already replaced all epics with features.