I'm using the Power BI Connector for JIRA from tempo software to connect the data from JIRA in Power BI.
For a specific project (risk) I want to see the start values from the issue. In the connector I can select the histories table, but this table doesn't contain the values where the issue started with.
So, in which table or something can I find the start data from the issue when the issue was created?