is there a programmatic way to pull a custom field (Target End Date) from one project's ticket into another ticket
For example: I'm on project X and in my ticket i reference that ticket 1 from Project Y is the List needed.
Can i programmatically add a formula into the Acceptance Criteria of my ticket that searches for what is populated in the custom field (in this case Target End Date), so that i can see that target end date populated in my acceptance criteria?
I saw the inline view of the link only shows key, summary and status. can a custom field be pulled in there if the above is not possible?
Currently i am manually drilling into the List Build ticket to find the target end date and than manually entering that date into my ticket