I am using a Team Managed Software project with a Kanban Board. My tickets (tasks) have Story Point Estimates assigned. How do I get these to show on the cards on the Kanban? If I need to change the project type I can, but I don't want to use sprints.
Also (nice to have), is it possible to have the Story Point Estimates total at the top instead of number of tickets?
Thanks!

