Hi Team,
Greetings of the day!!
We are seeking sprint worklog reports that detail the time spent within the current sprint period. It is important that we exclude any time logged on issues from previous sprints. Additionally, we require the time tracking to be reported separately for each Collaborator.
For example, consider we have 10 tickets in Sprint A. During this sprint, we logged time for all the tickets. However, 7 of these tickets have been closed, while the remaining 3 have been moved to a new sprint called Sprint B. In Sprint B, we do not want to include the time spent on those 3 tickets from Sprint A; instead, we need to capture the time spent on these tickets as logged in the current Sprint B.
Also, we need to track the time spent for each collaborator.
Is there a way to generate the sprint reports to reflect this requirement?
Thanks,
Rohith.