At the epic level we assign story points to determine the amount of work a given project will be. The hope is to be able to report on that field and sum it up to cross-reference with assignee. This will allow us to manage the team's bandwidth easier. I know you can sum up story points within an epic based on issue types at the lower hierarchies, but we want to sum them up across epics. I.e. John Doe is currently assigned to issues totaling 15 story points vs. Jane Doe is currently assigned to issues totaling 25 story points. This would be much more accurate to report on than just total number of epics that they are assigned since our epics have a wide range of how much time they take to work through.
Has anyone had success doing this or something similar?