Hi, I'm using the Jira insights function to check the stuck,blocked,flagged issue in board or sprint. I notice that in stuck part, there is a tip about '85% of the time, issues have moved out of this status by now'. On Every board the number of '85%' is same, even though the number of stuck issues are different on different board.
I'd like to know how to calculate the result of '85% of time'. Is it about 85% of time of all the issues in all projects in Jira?