I have a project with 400 Epics and some of them have Stories / Subtasks. I want to define Start / End Date on Epic Level manually. When I try that, Big Picture overwrites those dates for the Epics that have children. I already set the default Scheduling mode for the project to "manual" but that only affects new Epics, not existing ones. I tried finding a way of bulk changing the existing Epics to Scheduling Mode: Manual but I can't find that feature.
Changing 400 Epics manually would be a total pain.
Any chance that can be bulk changed?