I have X Jira Story issue displayed on my screen (example: Story 2 displayed)
- Story 1 needs to be completed before Story 2
- Story 3 needs to be completed after Story 2
For linking issues in Jira Story 2:
- is Story 1 linked as the pre-requisite?
- is Story 3 linked as the post-requisite?
There is a difference of opinion as how these linking terms should be used