We have cycles (2 per quarter) for epics to schedule in. However, to display tickets on the timeline, dates are required. To avoid people looking up calendars to set the date, I wanted to automate that. So If cycle "1.2 24" is selected from the dropdown, then the start should be set to 19/02/24 and end to 3/03/24 for example.
Is there a way to define those values and automate them that way? Each cycle will have a specific start and due date.
Thanks.