Goodmorning,
Within our project team we are using the timeline and board to visualize and plan our projects.
We only see the EPIC projects on our timeline, which is great. However, we want to make another differentiation between some projects and use these as a filter to ensure some projects are visible, and some or not.
We already have a filter (I believe this was standard) and through this way we can choose which projects to showcase and which not (which is basically what we want). But, there is no option to save the current/chosen projects as a filter. Which means that everytime I change pages and return to the timeline, all projects are visible again.
I assume it must be possible to save the filter?
Any help or advice is greatly appreciated.
Tim