I have a hundreds of issues that are linked together using a 'blocks' and 'is blocked by' relationship.
I'd like to replace all of those links with a 'needs to be done before' and 'needs to be done' after' relationship.
I can do this on a ticket by ticket basis by adding a new issue link and removing the old one, but is there a way I can do this in bulk?