Hello Community,
My team use Tempo to track employee timesheet, when I was looking at some tickets, I realize the original estimation, time remaining and time spent are not summed up correctly, for example I have a ticket that has estimated = 22.5hr, logged time= 19.25hr, but the remaining time = 17hr. And the reason for this is the original estimation was added to the system after the work started, so there were 13.75hr logged before the estimation was given to Jira.
Is there a way to add back the 13.75hr to the system so the time tracking reflect the reality, without affecting our tempo timesheet?
Thanks for your help!