Hi Everyone, I am looking for a solution where I have 2 fields "Original Estimate" and "Time spent" in my tasks . I am trying to get report which is grouped by assignee and labels which Assignee has spent this much time when he has got this much estimated time for this label .
Assignee | SUM(Original Estimate) | SUM(Time Spent) | Label
Assignee1 20h 30m 21h 45m Label 1
Assignee2 21h 35m 21h 45m Label 1
Assignee2 1d 23h 4m 1d Label 2