- The scrum board can be switched by the scrum master
- How can an end user switch the scrum swim lane view from Epics to Assignee?
use case:
We have multiple tiger teams 2-3 engineers with a single backlog, and a single board.
We could create separate boards, but that adds an overhead to SM to change the baord during the stand up and devs tracking the boards.
If we have a single board the SM can switch the view and walk through the agenda, asking each tiger team, on track or not and then switching to assignee status