Hi,
I have a problem, I have reported 7 days of work to time tracking.
Later the bug was closed and I was asked to write the time spend, I have write 7 days.
the time tracking showed 14days.
I wanted to edit this field and indicated 7 days in the time tracking field,
realized that that field is always summing the introduced days.
What should i do, i have all the permissions?
BR,
David.