I have a Kanban board with two status' TO DO and IN PROGRESS. I have a scrum board with a totally different workflow (includes TO DO and IN PROGRESS) which includes tickets all assigned to various sprints.
I have been asked to show the tickets on the kanban board on the Scrum Board. However I do not see that this is possible if they are not part of a sprint. Am I correct? or is this possible.
Thanks