How to get unassigned 'testing' subtask(parent story has assignee) to show up in unassigned swimlane. Have a subtask that is unassigned with parent story assigned , swim lanes are set by assignee and option to show unassigned at bottom of all swim lane is enabled yet the "unassigned" swim lane doesnt show up. there is no "story" that is unassigned, only subtaks are unassigned. sprint for the subtask is same as parent story.