Hi all!
I have a scrum board and it currently has a Backlog column. If I remove that column, I don't see any issue on the backlog.
I checked the issues and they have the backlog status and this is the default one when added.
I want to have To Do as the default one, and not to have a backlog status, so that all issues without sprint are sent automatically.
Want can I do? Do I need to modify the workflow? If I do this, what happens with the tickets currently with the backlog status?