Hi, I have a problem with setting up automatic time logging in a project.
We have a plugin for Jira called "Timesheet Tracking for Jira" with which we look at the calendar every month to see who has worked how much time on a project. However, some people we know in advance will always have 8h in one project, so I wanted to automate this.
However, I can see that a trigger is needed to trigger such an automatic action, plus I have the problem that this time should be attributed to other people and not to me.
Does anyone know how to create such automation? I have already tried "when: Scheduled then logged" or "when issue assigned then logged".
