Hi!
I'm trying to make a Jira project to track progress on testing some widgets. just looking for some basic information on how to get started, what types of things can be done and what can't, etc. Is there a "getting started" or "Introduction FAQ"? So far I'm thinking to assign an issue to each widget and use a set of statuses (one for each test station). Timestamps will be applied during transitions between statuses to keep track of how much time each widget spends at each test station. Is it easy to create a report listing each issue showing it's timestamps and any notes it collected along the way?
Best,
Sean