We have a backlog with multiple epics and issues/tasks. As of right now, we would like to start adding issues/task/etc into current epics but we are seeing 2 different things.
- New issues/tasks created within the Epic are added without issues and the progress bar are showing as stated below. The label displays Issues in this epic.
![2022-05-27 15_12_39-[VD-916] Toolbox Dev_ Tire Vizualizer - Rivian.jpg 2022-05-27 15_12_39-[VD-916] Toolbox Dev_ Tire Vizualizer - Rivian.jpg](https://us.v-cdn.net/6038660/uploads/images/199672iCDFD3FF355B68BC5/2022-05-27%2015_12_39-%5BVD-916%5D%20Toolbox%20Dev_%20Tire%20Vizualizer%20-%20Rivian.jpg)
- Existing issues/tasks that are added to an existing epic through Link Issue or by clicking on the + show no progress bar after adding them. Also the label display Linked Issues.
![2022-05-27 15_15_06-[VD-902] Simulation_ RPV700 Final Model Validation - Rivian.jpg 2022-05-27 15_15_06-[VD-902] Simulation_ RPV700 Final Model Validation - Rivian.jpg](https://us.v-cdn.net/6038660/uploads/images/199674i9856C5579B93178B/2022-05-27%2015_15_06-%5BVD-902%5D%20Simulation_%20RPV700%20Final%20Model%20Validation%20-%20Rivian.jpg)
If you can point me in the right direction.