team managed project boards were created here, no need to get into why. the individual TMP boards show the story points beside each ticket and sum them at the bubbles at the top of the sprint. story point estimation is turned on in each issue type and board.
But we need to see a board with tickets from other team managed projects.
I have created the filter that combined tickets from 2 TMP. I created a scrum board using the filter. the tickets show in each sprint on this board. yay! but the story points do not show nor do they sum in the bubbles at the top. In board configuration under Estimation, Story Points are selected
am I trying to do the impossible because the projects I am filtering on are TMP?
( moving to CMP is possible, just not near term )
thank you.