Hi,
I'm looking to setup an automation which would be triggered whenever original estimate value is changed. And the changed value needs to be copied to "Story Points". The tricky part is to convert the estimates into their equivalent story points. For eg, if 1d(8h) is added the story point should be updated with 1 story point and if 4h is added, the story point will be 0.5.