We are implementing a flow where in the flow goes through iterations for a set number of statuses. For eg. consider the below statuses with in a flow.
Creation -> Review <-> Creation Edit -> Finalization
There could be multiple iterations between the Review and the Creation Edit statuses before the issue reaches the finalization status. I will get the date for the transition of the issue from Creation to Review the first time it happens. This date will get overridden as soon as the issue is moved from Creation Edit status to Review status. Similarly, the date captured during the first entry of the issue into the Creation Edit status will also get overridden once the ticket moves from Review to Creation Edit for the second iteration (if that happens).
Is there any way in which the overwriting/overriding of these dates can be prevented so that I can have access to the initial status entry dates as well as the dates from the iterative transitions?