We have a project for all of UX. The project has two kanban boards. The first board was just the main one associated with the project. The second board appeared after I created a 'component' for the Design System to manage that work separately and have a different release schedule.
I created an Epic in the Design System kanban board, then started to create Stories under that. The stories, somehow, ended up in the main UX board, while the epic still shows under the component Design System board.
How can I move the Design System stories from the main project board to the component board?