Hi All,
Is there a way we can make 'time spent' or other time tracking mandatory before an issue is set to closed?
I'm aware this is possible in Classic but need to achieve in Nextgen.
I'm able to make other fields mandatory such as Assignee etc but cannot see a way to do this is with the Work Log fields.
Thanks