When you create a dependency in Roadmap (drag the + symbol) it creates a link between issues of 'Blocks / Is Blocked by'.
I would like to use a different link type so i can sync between Roadmap and the BigPicture app. BigPicture is powerful but too much for most users. The dates align but the links do not as BigPicture uses a custom link type 'must be done before / must be done after'
Also i use 'blocks / is blocked by' for technical blockage which may or may not be the reason for a schedule dependency.
Can I tell Roadmap to use a different link type?
Thanks
Peter