I'm trying to break down the time tracking on some tickets into hours and the way JIRA has summarized the hours is very confusing.
I assumed that 1 day would be equal to 8 hours, but on this one ticket the time is being reported as "4d16h logged."
Why wouldn't that be 6d instead? If it is counting the days as 24 hours, 96 hours + 16 hours seems way too long and I'm sure that was not the time logged for this ticket.
What is a "day" increment supposed to mean in hours?