I pull cards from several other projects into my project so that my team which provides shared services to all these projects can see where all their work is. I use a board filter that includes all these projects to pull the cards in. I use swimlane by Epic. This works fine except when the card is assigned to an Epic in that pulled in project; then it is not displayed on my project kanban board.
Seems like the Epic swimlanes assumes that all the Epics are defined in my project and if the epic is defined in the other projects it ignores it and does not know to which swimlane to assign it to. Is there any way to make the card display even if the epic is not defined in my project?
Note. the cards display correctly if the swimlane is by project.