I am facing issues on the scrum board created based on filter query. I have created three scrum boards ( scrum A, B, and D). with the same project using filter query. I have used the field to separate the stories and display them on the required board. but when starting the board in board A, other boards ( B and D) getting started.
How can I control the sprint start/stop separately based on team sprint as we have a different start date for each team?