Hi We are using Jira Cloud and have turned on Remaining Estimate and Time Spent to use for the burndown report.
When someone uses time tracking to log time And reduce the RTE, the RTE entry is logged at the correct time But the Work logged has a time in the past (which matches the work logged).
In the attached screenshot you can see
1) EDWTSW-103 has 1d 10 min work logged (8hr 10 min)
The RTE Change is at 9:32 am but the Work logged is at 1:22 am (8hr 10min earlier)
2) EDWTSW-83 4hr work logged
The RTE Change is at 9:39 am but the Work logged is at 5:39 am (4hr earlier)
I was expecting the Audit times for both events which were performed at the same time to be the same?