Hi Everyone,
In the next-gen project, I see the 'To Do' status for tickets, in the Backlog and the Board, how can I distinguish between the two in a filter easily?
The only way I could do this, was by assigning a story point or finding a common feature to add to the Board tickets vs. the Backlog tickets.
Ex. All tickets in Board have story pt estimate = 1, All tickets in Backlog story pt estimate is empty
Any other better way to get this distinction?