Hi,
I can't figure out how to set the default selection for the "Priority" field drop down in my classic project when I create a new Issue, or Sub-Task. Right now, the "Priority" field drop down defaults to "High". Anyone know how I can change this for my project?
p.s. - I do not want to handle this via a Post Function in the Create transition. 🙂 I want the actual drop down to show the desired default selection.
Thanks!
Ryan