Hello,
I'm trying to create a workload pie chart that shows total time spent/logged by epic. However, when I set Statistic Type to "Epic Link" or "Epic/Theme," the pie chart shows time spent, but no epics (the only "epic" that shows is "None"). I have plenty of epics and issues assigned to them, so I'm not sure why they aren't showing up. The chart works correctly when I change the Statistic Type to other types (like "Assignee").
Thanks for your help!
Sarah D.