I generally work off of the RapidBoard for my sprints. If I click Create Issue, and then save that issue, briefly there is an option to add it to my sprint. However, if I miss that option - what's the easiest way to add that issue to a sprint?
My current method is to go to the backlog and then drag/drop from the long list of bugs up to the current sprint.
Is there is a better way?