Hello everyone,
We are trying Biggantt in our Jira Site (Cloud) and from one week when we create the WBS manually it does not appear automatically the "Relates to" link in the issues connected.
Please see the example below, we expect a "Relates to" link between TPSW-43 and TPSW-45, 44 and 46.

We already checked the link configuration, but the links listed are referred only to the connections made between the start and the end of two issues.
How can we re-set the link between two issues when a WBS is created?
Thank you