I have two project and currently using two different field with different drop down value
Example Project A with Field FieldA ( F1,F2,F3)
Project B with Field as Filed B(R1,R2,R3)
Requirement is :
Field A should be used in both project .
But the existing/old card value should not change.
Could you please guide how to do it?