I am a scrum master and the product owner wants to track the team's time spent and create a report based on the amount of time the team spends on a particular epic or issue label. Is this possible? He does not want a report of story points based on epics/labels. He wants to know exactly how much time is spent by a team member on a specific issue/task/story to completion.
The team has started to estimate the time spent in each issue but I don't know how to run a report on time spent under an epic and label. Is time spent a canned report? Is it easy to track time spent under a particular epic or label or component?