I have a next gen Scrum board that I'm trying to configure to group by Story. From the looks of it, grouping by Story doesn't work if the story doesn't have any sub tasks. However, my stories are made up of linked issues. The reason for this is that we have several issues that span multiple stories (components need updating in common components, etc).
So, my story has 8 linked issues, all with a 'requires' operator. I've moved the story into this Sprint, however when I look at the Board, there is no way for me to group by story and see the linked issues underneath it.
Is what I'm trying to achieve possible?