We want to clone a series of stories all at the same time. Is there a way to do this through JIRA?
Example is:
- We have 20 stories associated with each new project.
- We want to be able to use the old 20 stories (for a previous project) but with the new project name.
- If there are other ways besides cloning - like batch story creation - that would be great as well.
Thanks,
Jason