First off - I converted the project from a basic kanban type to a scrum type, which may have something to do with the problem I'm seeing.
I've created a sprint, but, in the board, some of the issues don't show as cards -- they show as a single line that spans all columns (like in the backlog). They show the status in an outlined box after the item id.
I notice two things:
- The singe line items have subtasks
- The single line items are not owned by me
Do one of these conditions trigger this behavior?
Thanks,