Hi;
I'm our JIRA administrator (not a very knowledgeable one). I'm trying to figure out if we're backing up our JIRA instance. And if not, what we have to do to back it up.
Our System / Backup manager is set as follows:

The three projects listed above that are not backed up - not that important (they are not our main projects).
So, are all the other projects being backed up? And if not, what do I have to do to turn that on?
And for the next-gen projects, is there no way to back them up?
thanks - dave